An equipment plinth concealed the edge of the membrane. This example follows temporary access, waterproofing and reinstatement.
Illustrative scenario · A narrative example of work stages and final checks; it does not document an actual completed project.

The equipment schedule set the start date
In this fictional scenario in Lucera, an exterior plinth supported a piece of equipment that required service access on two sides. During a roof inspection, a technician noticed that the previous waterproofing ended behind the machine's feet, where access was limited. The person responsible for the fictional building arranged a shutdown with the service installer so the detail could be exposed. The initial visit recorded the position of the connections and the route needed to reach the plinth. The team also observed where runoff went upstream and downstream. The repair was planned as a coordinated project between the people responsible for the equipment and the crew restoring the protection to the roof.
The survey marked the parts to protect
Once the installer made the plinth accessible, the technician examined the adjacent substrate and the waterproofing turning up the vertical face. The finish was distorted near one corner. On another side, the edge of the existing system could be clearly identified. The survey showed where the repair could tie into that section and where more extensive preparation would be needed. The installer marked the position of the feet relative to the face of the plinth. The crew also recorded the clearance needed to withdraw a panel from the machine. That space had to stay free during reassembly and after the protection went in. Initial photographs showed the area with the equipment moved by the specialists.
The material had to suit the junction and the substrate
The technician specified a repair system compatible with the existing waterproofing and the plinth substrate. The design included corner pieces to be checked before the final protection went on. Space against one vertical face was limited. A workshop sample made it possible to compare the finished thickness with the clearance left by the equipment connections. The designer adjusted the edge of a protective piece that would have come too close to the service panel. The project also established how to keep the equipment bearing points separate from the new junction. Both crews received the drawing and the planned shutdown sequence before work began.
The equipment returned after the edge inspection
The crew prepared the horizontal surface and upstands during the agreed shutdown. The technician compared the exposed substrate with the survey notes. The junction was completed before the surface protection was reinstated. The corners were examined with the joints visible, and runoff was checked using the agreed procedure. After the waiting period specified for the system, the service installer returned the equipment to its prepared positions. The connections were checked and the service panel opened. The roofing crew was available during this review. A new component could have been intact when laid and damaged during reassembly, so the junction was visually checked again after the machine went back.
The handover drawing showed the bearing points
The final record logged two separate checks: the equipment was back in service, and the waterproofing junction around the plinth had been inspected. The person responsible for the fictional building received a drawing with the bearing points and the strip to keep accessible. Photographs taken while the machine was away showed edges that would be partly concealed in service. The file noted where to observe runoff during a future visit and when another coordinated shutdown would be needed. The chosen material was identified in the roof record. The equipment record showed the route for removing the service panel, which had been checked after the finish was complete.