Casa Pescara Italiano

Bathroom · 3 min · Published

A shower screen below a beam in a Moscufo bathroom

In an illustrative Moscufo bathroom, survey and finished-surface checks precede ordering a screen below a beam.

Illustrative scenario · A narrative example of work stages and final checks; it does not document an actual completed project.

Pale bathroom with a timber vanity and glass shower
Illustrative image

The beam was missing from the floor plan

In this illustrative case, a bathroom in Moscufo was renovated around a beam that crossed part of the ceiling. The floor plan showed a rectangular shower with a tall screen and a side opening. When the supplier measured the section, they found that a piece of hardware would reach the spot where the beam reduced the available height. The design needed the room section as well as width and depth. The household explained how they entered the shower and which side they cleaned from. The highest point in the room gave little guidance about the fitting. The relevant dimensions followed the movement of the screen past the beam and finished surfaces.

The survey recorded more than one height

The fitter marked the underside of the beam, the proposed finished floor and where the profile would sit. The side wall also had a slight variation that could be assessed after tiling. One proposal used shorter glass across the opening and left more room below the beam. The other separated a fixed section from a moving one and adapted the design to the available height. The supplier explained which arrangements the system allowed. Using a mock-up, the team checked access and the swing with fixtures in their intended positions. The drawing marked provisional dimensions so they could not be mistaken for measurements ready for manufacture.

The finish showed how the screen would meet the beam

The design compared a visible trim with a more discreet option compatible with the selected glass. The first made the edge clear and could emphasise the change in height. The second left more tile visible and needed a precise junction. The household viewed the outlines from the door and basin. After checking the components, they chose a lower fixed part beneath the beam and access from the taller side. The tiler added the glass line to the tile drawing. The professional checked supports, fixings and the relationship with waterproofing. The trim and hardware references went into the file before installation.

The glass was ordered after the surfaces were finished

Before tiling, the coordinator recorded the substrate and points agreed with the installer. After tiling, they checked finished floor height and the relationship between wall and beam. Only then did the supplier take the dimensions for manufacture. A slight variation at the wall was handled by the system detail without changing the opening position. The schedule kept the intermediate check and order separate. The household was told when the shower would be ready for use and which parts needed to stay clear until fitting. Pictures recorded the travel of the hardware so the result could be checked after the other junctions had been covered.

The final check followed a hand on the handle

At the illustrated handover, the fitter moved the screen through its full travel and checked clearance near the beam. The household repeated entering, checked that the handle could be reached and showed how they would clean the exposed edge. The coordinator checked the profile against the wall finish under the product instructions. The final drawing recorded height, opening side and fixed panel position. The layout left the change in ceiling height visible while keeping it away from the movement of the glass. If the shower is updated later, the file distinguishes the beam measurements from the glass and shows which details were checked during fitting.

Moscufo · PE · Abruzzo · Distance and service-area coverage ↗

How we prepare the guides: sources and illustrative scenarios