Bathroom threshold beside a parquet hallway in Silvi
An illustrative Silvi bathroom retains the hallway parquet while checking height, door swing and the edge of the new tiles.
Illustrative scenario · A narrative example of work stages and final checks; it does not document an actual completed project.

The old step belonged to two rooms
In this illustrative case, a bathroom in Silvi was renovated beside a hallway with parquet that had to stay. The old threshold projected into the hall and the closed door covered only part of it. The plan called for a new bathroom floor. Before removal, the installer marked the door position and the timber edge that would remain. Once the old threshold was lifted, a difference between the substrates became visible. The measurement went on a section showing both finished floors. The household explained that they crossed the point at night under hallway lighting and wanted a clear edge without more projection than the detail required.
The survey established what would stay
The existing timber and door were the fixed references. The professional checked clearance throughout the swing and assessed the timber edge beside the old joint. The tiler calculated the new bathroom floor build-up with its necessary preparation. They drew two alternatives on the same section. One used a visible profile to handle the difference. The other changed the level inside the bathroom if that suited the rest of the design. The surveyor checked each option against the substrate and fitting requirements. The comparison also included cleaning access. An attractive line at the doorway needed to work for the people crossing it and caring for both floors.
They viewed the sample with the door closed
The household put two profiles beside the tile and parquet. Both were clear with the door open. With the door closed, one showed a wider strip from the hallway. The fitter proposed moving the line relative to the frame while accommodating the floor and the movement allowance for timber. They chose a profile that could be seen against the parquet without becoming a broad strip in the hall. The plan recorded heights, finish and end details. The person responsible for the door confirmed clearance during the swing. The bathroom tile layout was adjusted so the cut beside the transition followed the pattern without leaving a vulnerable edge.
The fitting sequence kept the timber protected
Before preparing the floor, the coordinator recorded the existing edge and agreed how it would be protected. The tiler checked the substrate height and showed where the profile would go before fixing it. An intermediate trial used a mock-up at the intended height to check the swing. The professional reviewed how the transition met the bathroom layers under the design. A variation by the frame required an end detail to change before fitting. The updated drawing identified who finished the tiles and who checked door movement. A picture recorded where the two surfaces met before the profile covered the underlying detail.
The final check began in the dim hallway
At the illustrated handover, the household crossed the threshold under their usual evening light and repeated the movement with the door open and closed. The coordinator checked the profile and door clearance. Both edges were checked for cleaning access. The file retained the final section and profile reference. The design kept the hallway parquet and handled the level change in the agreed place. If the door is replaced, the dimensions will help the next fitter check the new swing beforehand. The handover provided two reference heights and a marked position for the joint, so both sides could be identified during any later work.