Bathroom renovation in Rieti with a mirror cabinet in a tight space

An illustrative renovation in Rieti that checked a mirror cabinet against the basin, door frame and electrical points.

Illustrative scenario · A narrative example of work stages and final checks; it does not document an actual completed project.

Pale bathroom with a timber vanity and glass shower
Illustrative image

A shelf that encroached on the basin

In this illustrative case, the bathroom renovation in Rieti started with limited storage for everyday items. The old mirror had a shelf below its lower edge, almost directly over the tap handle. The door frame stood beside the basin, while the wall continued towards the shower on the other side. The available distances and the space taken up by items left on the shelf were recorded. The plan called for replacing it with a mirrored cabinet. The wall looked wide enough, but the area near the door frame still had to be checked with the cabinet door open and someone coming into the room.

Measuring the movement as well as the cabinet

A light mock-up represented the front of the cabinet, and two trials simulated the movement of the doors. A single full-width door extended into the spot where someone normally stood at the basin. With hinges on the other side, it passed in front of the frame and interfered with a hand on the bathroom door handle. Other models with split doors and shallower storage were compared. The selected arrangement put the door used most often towards the centre of the basin. The compartment nearest the entrance held items taken out less frequently. With the cabinet shut, its lower edge still cleared the tap handle.

The wall support and the light

The survey recorded what was behind the tiles at the intended mounting points. Before the cabinet was secured, the service routes shown on the existing electrical drawing were checked. An electrician assessed the light point above the old mirror against the proposed position and the documents for the selected components. The light stayed separate from the cabinet so either could be reached without dismantling the other. The bracket detail was updated after inspecting the wall support. It went onto the same drawing as the height of the lower edge, which remained a reference until the tap was fitted and its actual movement could be checked.

A second check after wall finishing

Once the wall finish was complete, dimensions were checked against the frame and basin again. Trial fitting showed that a handle on the sample came closer to the frame than the door dimensions alone had suggested. The cabinet position was adjusted within the limits of the selected system before the fixings were completed. The doors were then tried with the basin in place and two containers sitting inside the cabinet. The electrician checked the light after connecting it. Opening the cabinet still left the intended access point for replacing the relevant lighting component clear. That point was photographed for the documents kept after the renovation.

Tests with everyday items in place

At handover, the cabinet doors, bathroom door and tap were each checked through their movement. The storage was tested with the items for which it had been planned, including whether they could be taken out without brushing an arm against the mirror. A cleaning cloth could reach the inner edges and the open strip above the basin. The final sheet included the cabinet door adjustments, the light model and the fixing drawing. The service route was recorded separately, so the cleaning notes could be followed without having to interpret the electrical drawing. A picture showed the space above the tap with the cabinet shut.

Rieti · RI · Lazio · Distance and service-area coverage ↗